PDF

Estimating the Cost of Equity Using a Mining Build‑up Model

Petr Bora, Michal Vaněk

2017encost of equityminingriskbuild-up modelfinancial risks

Abstract

Language:

Among other methods, build-up models have been used to value equity. However, the build-up models are usually general models to appraise business and financial risks, and thus cannot fully mirror the special characteristics of different industries. The article presents a new model called ‘Mining Build-up Model’ to assess the risks of mining companies. The model has four modules of risks (A – Business risks, B – Financial risks, C – Mining risks, and D – Module of a mining company), altogether roofing 12 areas of different risks. To demonstrate its usefulness, the Mining Build-up Model was applied on a mining company called OKD, a.s. – a member of the mining group New World Resources (NWR) in the Czech Republic. For the different areas of risks, we quantified the components of risk, which became the starting points to determine the final risk premium. The quantification of the components of risks relies on expert evaluations of the degree of risk of the different components of risk in the risk modules. The weighs of the components of risks were determined using Saaty’s method (the Analytic Hierarchy Process – AHP). We found that in OKD, a.s. – a member of the mining group NWR – the risk premium of cost of equity reached the value of 12.52 % in 2013. As we worked with the risk-free rate of return at a value of 2.83 %, the cost of equity for OKD, a.s. – a member of the mining group NWR, amounted to 15.35 %. The weighted average cost of capital of NWR Plc was calculated as 12.34 %.

Download

Cite This Work

@article{162e91af-8fb9-46f0-9568-cff9d4c65dbf,
  title={Estimating the Cost of Equity Using a Mining Build‑up Model},
  author={Petr Bora and Michal Vaněk},
  year={2017},
  language={en}
}
TY  - JOUR
TI  - Estimating the Cost of Equity Using a Mining Build‑up Model
AU  - Petr Bora
AU  - Michal Vaněk
PY  - 2017
LA  - en
ER  -

Similar Items

Metallurgical Plant Design and Operating Strategies

The Australasian Institute of Mining and Metallurgy

This conference, held in Perth, Western Australia, focuses on the latest advancements in metallurgical processing plant design and operational strateg

2006enPDF

Metallurgical Plant Design and Operating Strategies

P Card, J Canterford

This document presents a collection of papers from the METPLANT 2011 conference focusing on metallurgical plant design and operating strategies. The o

2011enPDF

10.1080 08827509208952675.pdf HABASHI, FATHI ( WeLib.org )

FATHI HABASHI

In the past few years, extractive metallurgy has been advancing gradually, despite the absence of remarkable new ideas. This paper aims to summarize t

2026enPDF

Extractive Metallurgy of Copper, Fifth Edition Mark E. Schlesinger, Matthew J. King, Kathryn C. Sole, ( WeLib.org )

Mark E. Schlesinger, Matthew J. King

This book presents a comprehensive overview of the principles and practices of copper extraction metallurgy. The objective is to provide both a theore

2026enPDF

Direct leach approaches to Platinum Group Metal (PGM) ores and concentrates: A review

C.N. Mpinga, J.J. Eksteen

Platinum Group Metals (PGMs), often with associated gold, have very few occurrences where they are present in an ore deposit at economically extractab

2015enPDF

Extraction of PGMs from Low-grade Oxide Mineral Deposits

Cleophace Ngoie Mpinga

The thesis investigates alternative extraction strategies for platinum group metals (PGMs) from low-grade, high-chromium oxidized ores, which are incr

2018enPDF