Abstract

Language:

In the mining industry the initial capital expenditure budgeted in the feasibility study is being overrun structurally. These capital expenditure overruns have long been recognised, yet no method is available predicting the probability a mining project will experience an overrun. This thesis introduces a method to assess the likelihood and magnitude of an initial capital expenditure overrun occurring for future gold mining projects. A database is populated with 65 gold mining projects that have experienced an overrun. For each project, 19 variables are described in the database that define the projects. The variables are analysed using individual variable analysis and multivariate regression analysis to investigate whether a correlation can be found between the variables and the initial capital expenditure overrun. Using the results of the individual variable analysis, a tool is developed to semi-quantify the risk a future gold mining project is exposed to regarding an initial capital expenditure overrun. The tool can visualise the risk a project is exposed to in a 2D risk matrix displaying the likelihood and magnitude of a possible overrun. For 16 of the 19 variables a possible correlation is found. The variables are grouped together, representing root causes with regards to the initial capital expenditure overrun.

Download

Cite This Work

@article{1ce0fdc1-9483-457d-af91-dcc50c426c2c,
  title={A method to assess the likelihood and ma},
  author={J.P.P. Wetterhahn},
  year={2026},
  language={en}
}
TY  - JOUR
TI  - A method to assess the likelihood and ma
AU  - J.P.P. Wetterhahn
PY  - 2026
LA  - en
ER  -

Similar Items

Plant auditing: a powerful tool for improving metallurgical plant performance

Deepak Malhotra

This work discusses the essential components of a rigorous auditing process aimed at enhancing metallurgical plant performance. The objective is to id

2015enPDF

Optimization of Integrated Steel Plant R

This paper addresses the challenge of assessing the feasibility of wind power plant projects at sites with insufficient or no local historic wind data

2025enPDF

Design for Recovery of Precious and Base

2026enPDF

Electrochemical techniques for a cleaner

Important advances in electrochemical engineering technology over the last three decades have fostered the development of a lternative methods to alle

2026enPDF

Environmental and Human Health Risks Ass

2026enPDF

The Recovery of Precious and Base Metals

Increasing volumes of waste printed circuit boards from obsolete electronic equipment posed escalating environmental risks and resource losses due to

2026enPDF