PDF

eversvd,+6 (13)

Raymundo V. Romero, Marijane A. Iglesia

2026enriver morphologyfloodplainquarryingremote sensingmathematical modelingmeandering riverriverquarryamplitudewavelength

Abstract

Language:

This study investigated the relationship between floodplain area, wavelength and amplitude in quarry and unquarried portion of Lagoony River. Mathematical modelling was applied to gather the data with ground check to see the real situation. Geospatial data were assessed using computer application that represent satellite image of the earth. Mathematical expressions were used to describe the parts of the rivers related to the impact of river morphology and alteration in quarry area done by expressing the relationship between the product of wavelengths (λ) and amplitudes (A) of river meanders to floodplain area (Fa). The impact of river alteration and morphology was found that the mean value of λA is of great extent compared to the floodplain area on unquarried sections while it is opposite on quarried section. For parts that are not appropriate for quarrying the ratio between the flood plain areas and the product of the wavelength and amplitude are ranging from 0.028 to 0.13 with the mean value of Fa = 0.028A. However, for parts that are typical for quarrying are ranging from 0.71 to 2.83 with the mean value of Fa = 2.13A. Quantitative analysis of the data strengthened the results taken from physical investigation.

Download

Cite This Work

@article{2b64b7c8-98aa-4d75-81c6-d4339f2e19fc,
  title={eversvd,+6 (13)},
  author={Raymundo V. Romero and Marijane A. Iglesia},
  year={2026},
  language={en}
}
TY  - JOUR
TI  - eversvd,+6 (13)
AU  - Raymundo V. Romero
AU  - Marijane A. Iglesia
PY  - 2026
LA  - en
ER  -

Similar Items

Fundamentals of Dimensional Analysis Theory and Alberto N. Conejo (auth.) ( WeLib.org )

2026enPDF

Challenges and opportunities in the recovery of gold from electronic waste

Mudila Dhanunjaya Rao, Kamalesh K. Singh

Rapid global technological development has resulted in increased production of electronic waste, which presents both challenges and opportunities in r

2023enPDF

640069

Roger Rumbu

2025enPPTX

Optimization of Integrated Steel Plant R

This paper addresses the challenge of assessing the feasibility of wind power plant projects at sites with insufficient or no local historic wind data

2025enPDF

Design for Recovery of Precious and Base

2026enPDF

Electrochemical techniques for a cleaner

Important advances in electrochemical engineering technology over the last three decades have fostered the development of a lternative methods to alle

2026enPDF