No abstract available for this document.
@article{2cc2a7df-de1e-4921-9b41-ba893c48e7a9,
title={Life Cycle Assessment and Capitalized Cost of Tran},
author={Unknown},
year={2026},
language={en}
}TY - JOUR TI - Life Cycle Assessment and Capitalized Cost of Tran AU - Unknown PY - 2026 LA - en ER -
Veeresh Ramnarine, Vidyadhar Peesapati
The high-voltage (HV) assets in the existing power transmission network will experience increased electrical, thermal, environmental and mechanical st
Lan Jin, Dowon Kim
A power transformer is one of the most critical and expensive assets in electric power systems. Failure of a power transformer would not only result i
Mudila Dhanunjaya Rao, Kamalesh K. Singh
Rapid global technological development has resulted in increased production of electronic waste, which presents both challenges and opportunities in r
Roger Rumbu
This paper addresses the challenge of assessing the feasibility of wind power plant projects at sites with insufficient or no local historic wind data