M. A. Rhamdhani, P. C. Hayes
Detailed microstructure and phase characterisations of processed nickel laterite ore feed, reduced ore, and leached ore have been carried out using scanning electron microscope, synchrotron X-ray powder diffraction, and electron probe X-ray microanalysis as a part of study aimed to increase Ni recovery from the laterite ores. The majority of the nickel in the ore feed were found to be associated with fine grained goethite (Fe rich matrix of limonite composite) and serpentine particles. These phases were transformed to magnetite and olivine respectively upon reduction roasting. Nanosize metallic particles were also observed on the free surface of limonite composite particles following reduction roasting. Upon leaching, >90% of the nickel in the Fe rich matrix was leached out, while <50% was removed from the olivine and its composites. The characterisation results from this study were used to assist the analysis of thermodynamic and phase changes during reduction roasting and leaching described in Part 2 of the paper.
@article{3b0304c6-ba11-4297-9185-1f1f31ab7874,
title={Nickel laterite Part 1 microstructure an},
author={M. A. Rhamdhani and P. C. Hayes},
year={2026},
language={en}
}TY - JOUR TI - Nickel laterite Part 1 microstructure an AU - M. A. Rhamdhani AU - P. C. Hayes PY - 2026 LA - en ER -
The leachability tests for manufacturing scrap TV boards (STVB) have indicated the release of metals beyond the limit levels with potential problems f
Printed circuit boards (PCBs) from electronic gadgets at the end of their useful life period are currently being dumped in landfills or incinerated, c
C.N. Mpinga, J.J. Eksteen
Platinum Group Metals (PGMs), often with associated gold, have very few occurrences where they are present in an ore deposit at economically extractab
Introduction Concerns over air pollution and the environmental problem of acid rain have made governments all over the world tighten their regulations
This paper addresses the challenge of assessing the feasibility of wind power plant projects at sites with insufficient or no local historic wind data