PDF

2026 Andic Chloride Leaching Kinetics of Lead Jarosite Sludge

Dimitrije Anđić, Miroslav Sokić

2026enhydrometallurgylead leachingjarosite sludgechloride solutionswaste valorizationkinetics

Abstract

Language:

Waste products of zinc hydrometallurgy, such as Pb–Ag jarosite sludge, represent a significant environmental problem due to toxic properties associated with elevated lead content. At the same time, this material has economic value, making its valorization beneficial from both ecological and financial perspectives. This study investigates the chloride leaching of pretreated Pb–Ag jarosite sludge, which underwent sulphation roasting followed by water leaching. The experiments were conducted with a constant solid/liquid ratio of 1:20, a stirring rate of 150 rpm, and using a 4 mol dm3 MgCl2 solution as the leaching agent, while temperature (40–80 ◦C) and leaching time (up to 120 min) were varied. The results showed that temperature significantly affects the lead leaching degree, with the highest (95%) achieved at 80 ◦C after 60 min. Kinetic analysis revealed a diffusion-controlled mechanism, with an activation energy of 18.40 kJ mol −1. Due to the characteristics of the leaching curve, the process was divided into four segments, with corresponding activation energies determined for each segment (16.48, 11.80, 13.88, and 20.50 kJ mol−1).

Download

Cite This Work

@article{3eb9185f-a158-4555-9429-1907e8daa096,
  title={2026   Andic   Chloride Leaching Kinetics of Lead Jarosite Sludge},
  author={Dimitrije Anđić and Miroslav Sokić},
  year={2026},
  language={en}
}
TY  - JOUR
TI  - 2026   Andic   Chloride Leaching Kinetics of Lead Jarosite Sludge
AU  - Dimitrije Anđić
AU  - Miroslav Sokić
PY  - 2026
LA  - en
ER  -

Similar Items

Design for Recovery of Precious and Base

2026enPDF

Treatment of manufacturing scrap TV boar

The leachability tests for manufacturing scrap TV boards (STVB) have indicated the release of metals beyond the limit levels with potential problems f

2026enPDF

Leaching of Gold from Mobile Phone

2026enPDF

Recovery of precious metals from e waste

Printed circuit boards (PCBs) from electronic gadgets at the end of their useful life period are currently being dumped in landfills or incinerated, c

2026enPDF

Extractive Metallurgy 3 Processing Operations and Routes Alain Vignes ( WeLib.org )

Alain Vignes

This book provides a comprehensive overview of the various processing operations and routes in extractive metallurgy. The objective is to present a de

2026enPDF

Extractive Metallurgy of Copper, Fifth Edition Mark E. Schlesinger, Matthew J. King, Kathryn C. Sole, ( WeLib.org )

Mark E. Schlesinger, Matthew J. King

This book presents a comprehensive overview of the principles and practices of copper extraction metallurgy. The objective is to provide both a theore

2026enPDF