39-years Performance of Cemented Radioactive Waste in a Mound Type Repository

Igor A. Sobolev, Sergey A. Dmitriev

2004enradioactive wastecementationimmobilizationlong-term storageenvironmental safety

Abstract

Language:

Long-term field tests of cemented aqueous radioactive wastes in an experimental mound type surface repository were carried out at Moscow Scientific and Industrial Association 'Radon' from 1965 to 2004. Aqueous radioactive wastes of different compositions containing short-lived radionuclides including 90Sr and 137Cs at concentrations from 0.34 to 1.8 MBq/L were immobilized using cementation technology. Water solution to cement ratio was 0.66, grout mixing time 10-15 minutes, and cement paste hardening time 7 days. 73 cement blocks with a volume of 0.027 m3 were disposed of for long-term tests in a simple mound type surface repository. The atmospheric precipitates, which contacted radioactive cement blocks, were collected and analyzed for the content of radionuclides. In August 2004 the experimental repository was opened, cemented blocks, underlying and covering materials were retrieved for analyses. XRD analyses showed that along with amorphous tobermorite gel the main crystal phases in cements are calcite and portlandite. Both visual inspection and radiometric analyses demonstrate that cemented blocks are in good condition and that the cement paste has retained radionuclides from the wastes. Thus after 39 years of storage in the mound type repository the cemented aqueous wastes are reliable immobilized.

Download

Cite This Work

@article{405581fa-de61-4303-81fe-f232be8bc3d3,
  title={39-years Performance of Cemented Radioactive Waste in a Mound Type Repository},
  author={Igor A. Sobolev and Sergey A. Dmitriev},
  year={2004},
  language={en}
}
TY  - JOUR
TI  - 39-years Performance of Cemented Radioactive Waste in a Mound Type Repository
AU  - Igor A. Sobolev
AU  - Sergey A. Dmitriev
PY  - 2004
LA  - en
ER  -

Similar Items

Feasibility Study Plant Design

A. Ryan, E. Johanson

The design of process plants for feasibility studies must address several key objectives, including feasibility and constructibility, while focusing o

2005enPDF

Metallurgical Plant Design and Operating Strategies

The Australasian Institute of Mining and Metallurgy

This conference, held in Perth, Western Australia, focuses on the latest advancements in metallurgical processing plant design and operational strateg

2006enPDF

Optimization of Integrated Steel Plant R

This paper addresses the challenge of assessing the feasibility of wind power plant projects at sites with insufficient or no local historic wind data

2025enPDF

Design for Recovery of Precious and Base

2026enPDF

Electrochemical techniques for a cleaner

Important advances in electrochemical engineering technology over the last three decades have fostered the development of a lternative methods to alle

2026enPDF

Environmental and Human Health Risks Ass

2026enPDF