PDF

Increasing of leachate quality using an

Hassan Hashemi, Mahdi Safari

2026enleachatebioreactorwaste disposalmembrane

Abstract

Language:

The aim of this study was the increasing of leachate quality using integrated membrane bioreactor (MBR). The reactor was fed with treated leachate with overall 70-1360 mg/l chemical oxygen demand (COD). The analysis of COD, biochemical oxygen demand (BOD), total suspended solids (TSS), and total dissolved solids (TDS) were performed in feed and filtrate, wherever the system reached steady state twice a week for 6 months. In all loading rates, BODs concentration was less than the standard limit. The removal efficiency of COD in all experiments was up to 80%. Up to 99% of solids, which may mainly include colloidal solids, were removed with micropore membrane. There was no significant difference between TDS concentration in feed and filtrate. It was concluded that MBR is a versatile technology with high throughput and can treat compost leachate below standard limit if used after appropriate processes.

Download

Cite This Work

@article{442c7dcc-7b3d-4c82-8cb0-5ee6b9186826,
  title={Increasing of leachate quality using an},
  author={Hassan Hashemi and Mahdi Safari},
  year={2026},
  language={en}
}
TY  - JOUR
TI  - Increasing of leachate quality using an
AU  - Hassan Hashemi
AU  - Mahdi Safari
PY  - 2026
LA  - en
ER  -

Similar Items

Metal Casting Processes

Unknown, Unknown

This chapter discusses metal casting processes, highlighting the diversity and common characteristics among them. The objective is to elucidate the fu

2023enPDF

The Nature of Solid Iron and Its Grain Structure

Unknown, Unknown

This study focuses on the fundamental characteristics of solid iron, which is predominantly composed of iron atoms and provides a basis for understand

2023enPDF

775134358 PROJET METALLURGIE GENERALE POURBAIX

2026enPDF

842063941 SX configuration

2026enPDF

758686865 Procedes metallurgique speciaux

Ir. Méshac KIME ILUNGA

Ce document traite des procédés métallurgiques spéciaux, en mettant particulièrement l'accent sur l'extraction liquide-liquide, un processus mis au po

2026enPDF

729490895 TFC Jordi kayombo

Copper solvent extraction units at large hydrometallurgical plants face constraints in metal recovery, phase disengagement, and reagent consumption, d

2026enPDF