PDF

EVALUATION DU BUDGET PREVISIONNEL DE FRAGMENTATION DU CREUSEMENT DE L’INCLINEE DE CONTOURNEMENT DE LA ZONE EFFRONDREE POUR LA REPRISE DE L’EXPLOITATION - CAS DE LA MINE SOUTERAINE DE KAKULA NORTH (KAMOA)

MALEMBA YAV Christian

2025frminingunderground mineexcavationblastingfragmentationbudget

Abstract

Language:

The excavation of the bypass incline or developed gallery to access the mineralized area by bypassing the collapsed zone, a portion of the deposit that has become difficult or impossible to exploit through existing routes. It allows connecting different sections or levels, aiming to ensure the continuity of operations in areas where geotechnical stability, ground conditions, or the progression of the site require a new access route. The purpose of our work was to estimate the provisional budget for the fragmentation of the bypass incline to recover the collapsed area, before assessing the budget for the mining operation. A technique was implemented to calculate the explosive charge per hole, the total quantity per pattern by referring to the parameters used in this mine, as well as certain geotechnical parameters of the rock. Starting from the determination of the number of blasts for the entire project, which is 84 blasts, we determined the drilled meterage, which is 310 m, and the total amount of explosives per pattern, which is 530.7 kg. This allowed us to know the firing devices needed for the entire project, and subsequently, we evaluated the cost of the drilling and blasting operation. The cost of the chamber blasting operation according to the determined terrain and the cost of the drilling operation: 390600 USD for 26,040 m drilled, ratio 15 USD/𝒎𝟑; cost of the blasting operation: 103,358.13 USD for a volume of 13,140 𝑚3, ratio 7.8 USD/𝑚3.

Download

Cite This Work

@article{4ba88edd-534f-47c5-946b-b33e08658afe,
  title={EVALUATION DU BUDGET PREVISIONNEL DE FRAGMENTATION DU CREUSEMENT DE L’INCLINEE DE CONTOURNEMENT DE LA ZONE EFFRONDREE POUR LA REPRISE DE L’EXPLOITATION - CAS DE LA MINE SOUTERAINE DE KAKULA NORTH (KAMOA)},
  author={MALEMBA YAV Christian},
  year={2025},
  language={fr}
}
TY  - JOUR
TI  - EVALUATION DU BUDGET PREVISIONNEL DE FRAGMENTATION DU CREUSEMENT DE L’INCLINEE DE CONTOURNEMENT DE LA ZONE EFFRONDREE POUR LA REPRISE DE L’EXPLOITATION - CAS DE LA MINE SOUTERAINE DE KAKULA NORTH (KAMOA)
AU  - MALEMBA YAV Christian
PY  - 2025
LA  - fr
ER  -

Similar Items

2022 2023 TFE Mines Landry PACHECO TSHIJIKA

PACHECO TSHIJIKA Landry

2023frPDF

2022 2023 TFE ELM Gaetan MUKAZ TFE Final

Gaetan MUKAZ

2023frPDF

IMPACTE DU GRILLAGE OXYDANT SUR L’AMELIORATION DU RENDEMENT DE LIXIVIATION DE CUIVRE ET DE COBALT - Cas de Tenke Fungure mining

KYUNGU ILUNGU Consilia

L'exploitation minière du cuivre et du cobalt est cruciale pour l'économie de la République Démocratique du Congo, en particulier dans la région du gr

2025frPDF

TFC G3 Mines MBUYU KABILA

MBUYU KABILA

Ce travail d’option repose sur l’évaluation de la productivité pour une mine à ciel ouvert de MASHAMBA EST, cas du projet réduit Cut 5 A. L’étude a po

2023enDOCX

memoire Ir Jonathan KAZEMBE KIKUMBI, Grade II ELM

Jonathan KAZEMBE KIKUMBI

Ce travail scientifique traite l’amélioration de la politique de maintenance des alimentateurs à savoir l’alimentateur à chaine de model SAND VIK D4 d

2023frPDF

L’INFLUENCE DE LA GRANULOMETRIE SUR LA FLOTTATION DU MINERAI ALIMENTE ACTUELLEMENT A KZC

KYUNGU KILUBA Cindy, Ass. Guelord NGAMBA

Ce travail présente l’effet que peut avoir la variation du temps de broyage sur le rendement de flottation au concentrateur de Kolwezi. L’objectif pri

2023frPDF$30.00