Abstract

Language:

A key component of any process control upgrade project is the initial benefits analysis, which defines the correct scope based on the plant's economics, production requirements, and equipment capacity. A major study was undertaken by the Warren Centre for Advanced Engineering in collaboration with over 40 professionals from industry, government, and academia to establish a method for control benefits analysis aimed at Australian industry. This study addresses the organizational aspects of personnel interviews and data collection, as well as technical issues such as calculations and plant tests needed to predict control benefits. While the individual components of the method are not new, their integration provides a unique and coherent approach not available elsewhere. The paper also details seven industrial case studies that demonstrated substantial benefits, ranging from 1.4 to 6% of operating costs. The findings suggest that the developed benefits method is widely applicable to various processing plants, indicating its effectiveness in enhancing the profitability of process upgrade projects.

Download

Cite This Work

@article{57a69ac7-f570-4088-b002-b2d7f3e52a65,
  title={JPC WarrenCentre 1991[1]},
  author={Thomas E. Marlin and John D. Perkins},
  year={2026},
  language={en}
}
TY  - JOUR
TI  - JPC WarrenCentre 1991[1]
AU  - Thomas E. Marlin
AU  - John D. Perkins
PY  - 2026
LA  - en
ER  -

Similar Items

Optimization of Integrated Steel Plant R

This paper addresses the challenge of assessing the feasibility of wind power plant projects at sites with insufficient or no local historic wind data

2025enPDF

Design for Recovery of Precious and Base

2026enPDF

Electrochemical techniques for a cleaner

Important advances in electrochemical engineering technology over the last three decades have fostered the development of a lternative methods to alle

2026enPDF

Environmental and Human Health Risks Ass

2026enPDF

The Recovery of Precious and Base Metals

Increasing volumes of waste printed circuit boards from obsolete electronic equipment posed escalating environmental risks and resource losses due to

2026enPDF

Treatment of manufacturing scrap TV boar

The leachability tests for manufacturing scrap TV boards (STVB) have indicated the release of metals beyond the limit levels with potential problems f

2026enPDF