PDF

Recovery of Lead from Lead Laden Cupels

Cledwyn T. Mangunda, Olga Kuipa

2026enlead recoveryleachingelectrowinningcupellationhydrometallurgywaste treatment

Abstract

Language:

Cupels are generated by mines during the fire assaying of precious group metals. The cupels contain lead which is a known environmental hazard hence the need to recover it. This work illustrates how leaching and electrowinning processes can be combined to produce a hybrid lead recovery process. Bench scale tests were conducted for the hybrid leaching and electrowinning process using Methane Sulfonic Acid (MSA) as a leaching solvent at a concentration of 200g MSA per litre of water. A glass electrowinning cell fitted with a 9cm × 4cm pure lead cathode and 9cm × 4cm graphite anode with inter electrode gap of 15cm and a magnetic stirrer bar was used. Lead laden cupels (containing 30g lead) were subjected to simultaneous leaching and electrowinning and lead recovery after a period of 80 minutes was found to be 98%. The hybrid process was found to require about 20% less solvent than that required for the conventional leaching process which requires multiple stages to reduce the concentration of the solute in the raffinate to the same extent.

Download

Cite This Work

@article{5e9633ea-b149-4849-8a61-9206bfe8a2df,
  title={Recovery of Lead from Lead Laden Cupels},
  author={Cledwyn T. Mangunda and Olga Kuipa},
  year={2026},
  language={en}
}
TY  - JOUR
TI  - Recovery of Lead from Lead Laden Cupels
AU  - Cledwyn T. Mangunda
AU  - Olga Kuipa
PY  - 2026
LA  - en
ER  -

Similar Items

842063941 SX configuration

2026enPDF

Treatment of manufacturing scrap TV boar

The leachability tests for manufacturing scrap TV boards (STVB) have indicated the release of metals beyond the limit levels with potential problems f

2026enPDF

Recovery of precious metals from e waste

Printed circuit boards (PCBs) from electronic gadgets at the end of their useful life period are currently being dumped in landfills or incinerated, c

2026enPDF

Design for Recovery of Precious and Base

2026enPDF

729490895 TFC Jordi kayombo

Copper solvent extraction units at large hydrometallurgical plants face constraints in metal recovery, phase disengagement, and reagent consumption, d

2026enPDF

653682511 Cours 10 pyrometallurgie

2026enPDF