PDF

4D BIM for Construction Logistics Manage

Kane Whitlock, Fonbeyin Henry Abanda

2026enBIMconstruction logisticsproject managementsite planning4D modelingconstruction waste

Abstract

Language:

This study presents an investigation into the extent to which emerging building information modelling (BIM) can be applied to construction logistics management (CLM). Given the specialist nature of the domains, the study employed an in-depth qualitative interview, whereby six experts were interrogated about their experiences of BIM for CLM. The study found the main applications of BIM on CLM to be the creation of three-dimensional (3D) site layout plans and four-dimensional (4D) coordination of site processes and common user plant, updating the 4D logistics plan as the project progressed and collaboration in BIM-based logistics coordination. Furthermore, there was a consensus amongst interviewees on improvement in site safety, comprehension of logistics information, efficiency on site, and effectiveness of layout planning as the main benefits. Lastly, the lack of training with implications on understanding was one of the main barriers to applying BIM to CLM. The findings from this study have the potential to improve overall construction logistics processes.

Download

Cite This Work

@article{6fc564b9-d6db-495d-bafd-696468d02d02,
  title={4D BIM for Construction Logistics Manage},
  author={Kane Whitlock and Fonbeyin Henry Abanda},
  year={2026},
  language={en}
}
TY  - JOUR
TI  - 4D BIM for Construction Logistics Manage
AU  - Kane Whitlock
AU  - Fonbeyin Henry Abanda
PY  - 2026
LA  - en
ER  -

Similar Items

Optimization of Integrated Steel Plant R

This paper addresses the challenge of assessing the feasibility of wind power plant projects at sites with insufficient or no local historic wind data

2025enPDF

Design for Recovery of Precious and Base

2026enPDF

Electrochemical techniques for a cleaner

Important advances in electrochemical engineering technology over the last three decades have fostered the development of a lternative methods to alle

2026enPDF

Environmental and Human Health Risks Ass

2026enPDF

The Recovery of Precious and Base Metals

Increasing volumes of waste printed circuit boards from obsolete electronic equipment posed escalating environmental risks and resource losses due to

2026enPDF

Treatment of manufacturing scrap TV boar

The leachability tests for manufacturing scrap TV boards (STVB) have indicated the release of metals beyond the limit levels with potential problems f

2026enPDF