PDF

Investigating the impact of mineral royalty fiscal (1)

M.W. Songolo, E. Chisikulo, E. Chisakulo

2026enminingZambiamineral royaltieseconomic viabilitycopperZambian coppergovernment revenue

Abstract

Language:

Zambia’s mining industry has undergone various phases of mineral royalty changes since privatisation. Unlike many analyses that relied on subjective probability, this study employs the cut-off grade and mineral royalty model relationship to investigate how changes in mineral royalties impacted the net present value and cut-off grades of Zambian copper mines between 2008 and 2022. The results showed that net present value decreased by 10.39%, 6.13%, 9.69%, and 6.13% for Barrick Lumwana, Kansanshi, Nkana–Mopani Copper Mines, and Mufulira–Mopani Copper Mines, respectively, while First Quantum Minerals Trident’s net present value increased by 3.40%. Reductions in NPV correspond to higher government revenue, whereas the increase for FQM Trident reduced government revenue. For cut-off grades, returns increased by 0.42%, 1.20%, and 0.42% for Barrick Lumwana, First Quantum Minerals’ Trident, and Kansanshi, respectively, showing how portions of the Zambian copper orebodies accrued to investors, with a corresponding reduction in government revenue. Conversely, reductions of 0.24% and 0.38% for Nkana–Mopani Copper Mines and Mufulira–Mopani Copper Mines indicated that a share of the reserves accrued to the government, reducing investor returns. These findings demonstrate that mineral royalty adjustments redistribute economic value between investors and the government, affecting both profit margins and operational decisions. Besides distributional effects, all projects remained economically viable. The findings underscore the need for an optimal mineral royalty framework that equitably balance.

Download

Cite This Work

@article{70b720aa-140f-486b-93c7-a9cf913ea06b,
  title={Investigating the impact of mineral royalty fiscal (1)},
  author={M.W. Songolo and E. Chisikulo and E. Chisakulo},
  year={2026},
  language={en}
}
TY  - JOUR
TI  - Investigating the impact of mineral royalty fiscal (1)
AU  - M.W. Songolo
AU  - E. Chisikulo
AU  - E. Chisakulo
PY  - 2026
LA  - en
ER  -

Similar Items

Extractive Metallurgy of Copper, Fifth Edition Mark E. Schlesinger, Matthew J. King, Kathryn C. Sole, ( WeLib.org )

Mark E. Schlesinger, Matthew J. King

This book presents a comprehensive overview of the principles and practices of copper extraction metallurgy. The objective is to provide both a theore

2026enPDF

Treatment of manufacturing scrap TV boar

The leachability tests for manufacturing scrap TV boards (STVB) have indicated the release of metals beyond the limit levels with potential problems f

2026enPDF

10.1080 08827509208952675.pdf HABASHI, FATHI ( WeLib.org )

FATHI HABASHI

In the past few years, extractive metallurgy has been advancing gradually, despite the absence of remarkable new ideas. This paper aims to summarize t

2026enPDF

729490895 TFC Jordi kayombo

Copper solvent extraction units at large hydrometallurgical plants face constraints in metal recovery, phase disengagement, and reagent consumption, d

2026enPDF

IMPACTE DU GRILLAGE OXYDANT SUR L’AMELIORATION DU RENDEMENT DE LIXIVIATION DE CUIVRE ET DE COBALT - Cas de Tenke Fungure mining

KYUNGU ILUNGU Consilia

L'exploitation minière du cuivre et du cobalt est cruciale pour l'économie de la République Démocratique du Congo, en particulier dans la région du gr

2025frPDF

Direct leach approaches to Platinum Group Metal (PGM) ores and concentrates: A review

C.N. Mpinga, J.J. Eksteen

Platinum Group Metals (PGMs), often with associated gold, have very few occurrences where they are present in an ore deposit at economically extractab

2015enPDF