PDF

Recovery of pure silver from spent silver electroplating solutions via electrochemical process and zinc cementation

Tapany PATCHARAWIT, Chatisa KANSOMKET

2023ensilverelectroplatingrecoveryelectrochemicalzinc cementation

Abstract

Language:

Recycling of spent silver electroplating solutions has been investigated via electrowinning and electrorefining in comparison to zinc cementation technique in this research. Two different compositions of transparent and dark waste solutions were used having the remaining silver contents of 17.71 g⸳L-1 and 33.36 g⸳L-1 respectively. The waste solutions were used as an electrolyte in the first step of electrowinning at low current density of 0.015 A⸳cm-2. It was found that increasing electrowinning time from 4 h to 24 h increased the recovery of silver cathode for both types of waste solutions. The optimum electrowinning time was higher than 8 h, giving the recovery of higher than 97.5% and 98.5% purity for 24 h electrowinning. Through the subsequent electrorefining, the electrowon silver cathode was set as the anode, while HNO3 + AgNO3 electrolyte containing high silver content of 120 g Ag/L was used. By controlling the potential at 0.8 V, silver crystal of high purity > 99.9% was obtained. The highest recovery was 99.11% when using silver cathode obtained from electrowinning of the transparent waste solution. Zinc cementation however led to loss of silver in the precipitate form on the zinc metal surface, giving only 86.16% recovery.

Download

Cite This Work

@article{7819ac78-c129-4322-95a8-8c91d296ad76,
  title={Recovery of pure silver from spent silver electroplating solutions via electrochemical process and zinc cementation},
  author={Tapany PATCHARAWIT and Chatisa KANSOMKET},
  year={2023},
  language={en}
}
TY  - JOUR
TI  - Recovery of pure silver from spent silver electroplating solutions via electrochemical process and zinc cementation
AU  - Tapany PATCHARAWIT
AU  - Chatisa KANSOMKET
PY  - 2023
LA  - en
ER  -

Similar Items

Optimization of Integrated Steel Plant R

This paper addresses the challenge of assessing the feasibility of wind power plant projects at sites with insufficient or no local historic wind data

2025enPDF

Design for Recovery of Precious and Base

2026enPDF

Electrochemical techniques for a cleaner

Important advances in electrochemical engineering technology over the last three decades have fostered the development of a lternative methods to alle

2026enPDF

Environmental and Human Health Risks Ass

2026enPDF

The Recovery of Precious and Base Metals

Increasing volumes of waste printed circuit boards from obsolete electronic equipment posed escalating environmental risks and resource losses due to

2026enPDF

Treatment of manufacturing scrap TV boar

The leachability tests for manufacturing scrap TV boards (STVB) have indicated the release of metals beyond the limit levels with potential problems f

2026enPDF