Optimizing complex gold mill metallurgy

M.I. Brittan

2026engold processinggold millsoptimizationstatistical analysiscash flow

Abstract

Language:

A technique has been developed that analyzes routine mill operating data to determine the key operating parameters responsible for gold losses to tails. These parameters represent the prime operating variables having a dominant effect on gold recovery. The technique quantifies these effects for the specific plant being analyzed, providing a tool to optimize recovery and costs and to enhance the mine’s cash flow. The quantitative relationships generated will be different for each ore and plant; every case is site-specific and has to be treated on its merits. Examples are provided to illustrate the considerable metallurgical and financial benefits which can be realized from optimization. The examples are taken from case studies of mills in four major gold mining districts of the world.

Download

Cite This Work

@article{79c91d98-0530-45c9-b33d-fbfc848375f0,
  title={Optimizing complex gold mill metallurgy},
  author={M.I. Brittan},
  year={2026},
  language={en}
}
TY  - JOUR
TI  - Optimizing complex gold mill metallurgy
AU  - M.I. Brittan
PY  - 2026
LA  - en
ER  -

Similar Items

Metal Casting Processes

Unknown, Unknown

This chapter discusses metal casting processes, highlighting the diversity and common characteristics among them. The objective is to elucidate the fu

2023enPDF

The Nature of Solid Iron and Its Grain Structure

Unknown, Unknown

This study focuses on the fundamental characteristics of solid iron, which is predominantly composed of iron atoms and provides a basis for understand

2023enPDF

775134358 PROJET METALLURGIE GENERALE POURBAIX

2026enPDF

842063941 SX configuration

2026enPDF

758686865 Procedes metallurgique speciaux

Ir. Méshac KIME ILUNGA

Ce document traite des procédés métallurgiques spéciaux, en mettant particulièrement l'accent sur l'extraction liquide-liquide, un processus mis au po

2026enPDF

729490895 TFC Jordi kayombo

Copper solvent extraction units at large hydrometallurgical plants face constraints in metal recovery, phase disengagement, and reagent consumption, d

2026enPDF