PDF

2026 Mao Rhenium Recovery from Waste Acid by Pressure Leaching

Hancheng Mao, Shengdong Wang

2026enrhenium recoverywaste acidsulfide precipitationhydrogen peroxide leachingcopper smeltingmetal separation

Abstract

Language:

This study presents a combined process of sulfide precipitation followed by hydrogen peroxide leaching for rhenium recovery from copper smelting waste acid under ambient temperature and pressure. The process first removed copper through selective sulfide precipitation, then achieved co-precipitation of rhenium and arsenic to obtain a rhenium-rich precipitate. Subsequently, exploration of rhenium-containing precipitate leaching using H2O2 solution was conducted under isothermal conditions at 20 ◦C. The effects of H2O2 concentration, liquid-to-solid ratio, acidity, and leaching time on rhenium extraction efficiency were examined systematically. The optimal leaching conditions were determined as: H2O2 concentration of 150 g/L, liquid-to-solid ratio of 5:1 mL/g, stirring speed of 350 r/min, and leaching time of 30 min. Under these conditions, the leaching conversions of rhenium and arsenic reached 96.0% and 93.8%, respectively. Through characterization of precipitate and leaching residue using ICP, SEM-EDS, XRD, and XPS analyses, the process and related reactions were elucidated. Results demonstrated that low-valence rhenium oxides and sulfides serve as the main reactive species during H2O2 leaching, whereas organic sulfur, high-valence oxides, and copper sulfide remained stable and resistant to leaching. Selective precipitation of copper effectively eliminated insoluble metal sulfides from rhenium-containing precipitates, thereby enabling efficient separation of rhenium under mild conditions.

Download

Cite This Work

@article{7bebf82a-e401-47d7-8991-fa6a14867aea,
  title={2026   Mao   Rhenium Recovery from Waste Acid by Pressure Leaching},
  author={Hancheng Mao and Shengdong Wang},
  year={2026},
  language={en}
}
TY  - JOUR
TI  - 2026   Mao   Rhenium Recovery from Waste Acid by Pressure Leaching
AU  - Hancheng Mao
AU  - Shengdong Wang
PY  - 2026
LA  - en
ER  -

Similar Items

Optimization of Integrated Steel Plant R

This paper addresses the challenge of assessing the feasibility of wind power plant projects at sites with insufficient or no local historic wind data

2025enPDF

Design for Recovery of Precious and Base

2026enPDF

Electrochemical techniques for a cleaner

Important advances in electrochemical engineering technology over the last three decades have fostered the development of a lternative methods to alle

2026enPDF

Environmental and Human Health Risks Ass

2026enPDF

The Recovery of Precious and Base Metals

Increasing volumes of waste printed circuit boards from obsolete electronic equipment posed escalating environmental risks and resource losses due to

2026enPDF

Treatment of manufacturing scrap TV boar

The leachability tests for manufacturing scrap TV boards (STVB) have indicated the release of metals beyond the limit levels with potential problems f

2026enPDF