PDF

Cyanide Removal and Recovery by Electroc

Natacha Martin, Vinh Ya

2026encyanide removalcrystallizationprussian blueiron hexacyanoferrate

Abstract

Language:

Alkaline chlorination, an efficient but high chemical cost process, is commonly employed for cyanide (CN−) removal from CN-rich wastewater streams. CN− removal and recovery through the precipitation of Prussian Blue (FeIII[FeII(CN)6]3, PB) or Turnbull’s Blue (FeII[FeIII(CN)6]2, TB) were realized using iron salts, leading to a cost-effective and sustainable process producing a valuable recovery product. However, the precipitation of PB and TB is highly affected by pH and dissolved oxygen (DO). CN− removal and recovery from CN-containing water by crystallization of PB and/or TB were investigated using dissolved iron that was electrochemically generated from a sacrificial iron anode under various pH values, initial CN− levels (10 to 100 mg/L) and DO levels (aeration, mechanical mixing, and N2 purging). It was shown that the complexation of CN− with Fe ions prevented the vaporization of HCN under acidic pH. At pH of 7 and initial CN− concentration of 10 mg/L, CN− removal efficiency increases linearly with increasing Fe:CN− molar ratios, reaching 80% at the Fe:CN− molar ratio of 5. A blue precipitate was observed between the pH range of 5.7–7. CN− removal increases with increasing initial CN− concentration, resulting in residual CN− concentrations of 8, 7.5 and 12 mg/L in the effluent with the Fe:CN− molar ratio of 0.8 for initial concentrations of 10, 50 and 100 mg CN−/L, respectively. A polishing treatment with H2O2 oxidation was employed to lower the residual CN− concentration to meet the discharge limit of <1 mg CN−/L.

Download

Cite This Work

@article{7de10568-af85-4f42-9e21-aa734cb69c89,
  title={Cyanide Removal and Recovery by Electroc},
  author={Natacha Martin and Vinh Ya},
  year={2026},
  language={en}
}
TY  - JOUR
TI  - Cyanide Removal and Recovery by Electroc
AU  - Natacha Martin
AU  - Vinh Ya
PY  - 2026
LA  - en
ER  -

Similar Items

Optimization of Integrated Steel Plant R

This paper addresses the challenge of assessing the feasibility of wind power plant projects at sites with insufficient or no local historic wind data

2025enPDF

Design for Recovery of Precious and Base

2026enPDF

Electrochemical techniques for a cleaner

Important advances in electrochemical engineering technology over the last three decades have fostered the development of a lternative methods to alle

2026enPDF

Environmental and Human Health Risks Ass

2026enPDF

The Recovery of Precious and Base Metals

Increasing volumes of waste printed circuit boards from obsolete electronic equipment posed escalating environmental risks and resource losses due to

2026enPDF

Treatment of manufacturing scrap TV boar

The leachability tests for manufacturing scrap TV boards (STVB) have indicated the release of metals beyond the limit levels with potential problems f

2026enPDF