PDF

BIM for Construction Site Logistics Mana

K. Whitlock, F. H. Abanda

2026enBIMconstruction logisticsproject managementconstruction projects3D modelinginfrastructure

Abstract

Language:

Emerging Building Information Modelling (BIM) has been hailed as a revolutionary technology and information management process that facilitates collaboration and more efficient design and construction processes through innovative 3D modelling software, open access to information and multidisciplinary integration. The deadline of compliance to BIM level 2 on all public sector centrally procured construction projects has expired, leaving many construction firms anxious to adopt BIM. Most common documented applications of BIM have been in the areas of architectural and structural design, quantity surveying, construction project management, and sustainability, with very limited peer-reviewed studies on construction logistics management. The aim of this study is to investigate how BIM can be applied to construction logistics management. This study adopts a desk-top approach, with articles sourced from renowned scientific databases such as ScienceDirect, Google Scholar, and Emerald. The study culminated in the identification of benefits and barriers of adopting BIM for construction logistics management. Given only a desk-top approach has been used, the recommendations made should be considered as preliminary and warrant further empirical research.

Download

Cite This Work

@article{849db198-1727-4521-af07-03ae837177af,
  title={BIM for Construction Site Logistics Mana},
  author={K. Whitlock and F. H. Abanda},
  year={2026},
  language={en}
}
TY  - JOUR
TI  - BIM for Construction Site Logistics Mana
AU  - K. Whitlock
AU  - F. H. Abanda
PY  - 2026
LA  - en
ER  -

Similar Items

Metal Casting Processes

Unknown, Unknown

This chapter discusses metal casting processes, highlighting the diversity and common characteristics among them. The objective is to elucidate the fu

2023enPDF

The Nature of Solid Iron and Its Grain Structure

Unknown, Unknown

This study focuses on the fundamental characteristics of solid iron, which is predominantly composed of iron atoms and provides a basis for understand

2023enPDF

842063941 SX configuration

2026enPDF

758686865 Procedes metallurgique speciaux

Ir. Méshac KIME ILUNGA

Ce document traite des procédés métallurgiques spéciaux, en mettant particulièrement l'accent sur l'extraction liquide-liquide, un processus mis au po

2026enPDF

729490895 TFC Jordi kayombo

Copper solvent extraction units at large hydrometallurgical plants face constraints in metal recovery, phase disengagement, and reagent consumption, d

2026enPDF

790734466 METALLURGIE EXTRACTIVE DU CUIVRE hydrome tallurgie

Non spécifié

L'hydrométallurgie du cuivre, principalement axée sur les minerais oxydés facilement solubles, s'applique également aux minerais sulfurés ou mixtes ap

2026enPDF