Radmila Markovic, Vesna Krstic
The electrorefining process of the non-commercial Cu anodes was tested on enlarged laboratory equipment over a period of 72 hours. The study utilized Cu anodes with nickel content of 5 or 10 wt.% and a total lead, tin, and antimony content of approximately 1.5 wt.%. A real waste solution with sulfuric acid character was employed as the working electrolyte, maintained at different temperatures (T1 = 63 ± 2 ◦C and T2 = 73 ± 2 ◦C). The current density was established at 250 A/m², consistent with commercial practices. The results confirmed the feasibility of utilizing these anodes in the commercial copper electrorefining process, as evidenced by the dissolution of elements from the anodes and the absence of total anode passivation, which allowed copper to be effectively deposited onto cathodes. The masses of the cathode deposits further validated the successful deployment of Cu ions from the electrolyte, thereby showcasing the potential for effective recycling of non-commercial copper anodes in metallurgical processes.
@article{ace1b061-2c3d-4f10-89c1-4198d5011ca6,
title={Electrorefining Process of the Non Comme},
author={Radmila Markovic and Vesna Krstic},
year={2026},
language={en}
}TY - JOUR TI - Electrorefining Process of the Non Comme AU - Radmila Markovic AU - Vesna Krstic PY - 2026 LA - en ER -
The leachability tests for manufacturing scrap TV boards (STVB) have indicated the release of metals beyond the limit levels with potential problems f
Mark E. Schlesinger, Matthew J. King
This book presents a comprehensive overview of the principles and practices of copper extraction metallurgy. The objective is to provide both a theore
Copper solvent extraction units at large hydrometallurgical plants face constraints in metal recovery, phase disengagement, and reagent consumption, d
Introduction Concerns over air pollution and the environmental problem of acid rain have made governments all over the world tighten their regulations
This paper addresses the challenge of assessing the feasibility of wind power plant projects at sites with insufficient or no local historic wind data