PDF

Analysis of Contract Change Order (CCO) Factors, Cost and Time Factors Affecting Bore Pile Work (Case Study of Cisauk Fly over Construction Project): A Systematic Literature Review

Indra Mahendra Sukardi

2025enconstruction managementcontract change orderscost overruntime delaybore pileflyover project

Abstract

Language:

Almost all government and private construction projects experience change orders initiated by either the contractor or the owner, leading to deviations from initial plans. This study aims to identify and analyze the factors causing Contract Change Orders (CCOs) and their impact on cost and schedule performance of bore pile work in the Cisauk flyover construction project in Tangerang Regency. A quantitative approach was used, with data collected via questionnaires from project participants and processed using IBM SPSS, including validity, reliability, normality, and factor analysis tests. The independent variables comprise six groups of factors: contract documents, planning and design, owner involvement, environmental/external conditions, contractor-related factors, and resource-related factors, each broken down into detailed indicators. The research will rank these factors and determine which are most dominant in influencing CCOs, thereby clarifying how change orders affect both cost and time performance of bored pile work in the project.

Download

Cite This Work

@article{bfa46bdb-089e-4608-973a-4cec3f994cc2,
  title={Analysis of Contract Change Order (CCO) Factors, Cost and Time Factors  Affecting Bore Pile Work (Case Study of Cisauk Fly over Construction  Project): A Systematic Literature Review  },
  author={Indra Mahendra Sukardi},
  year={2025},
  language={en}
}
TY  - JOUR
TI  - Analysis of Contract Change Order (CCO) Factors, Cost and Time Factors  Affecting Bore Pile Work (Case Study of Cisauk Fly over Construction  Project): A Systematic Literature Review  
AU  - Indra Mahendra Sukardi
PY  - 2025
LA  - en
ER  -

Similar Items

Effect of Roasting Temperature for Copper Leaching of Sulfide Concentrate by Combined Methods

Introduction Concerns over air pollution and the environmental problem of acid rain have made governments all over the world tighten their regulations

2023enPDF

Equation Driven Design and Validation of a Reverberatory Furnace for Non ferrous Metals

Roger Rumbu check

2025enPDF$30.00

Extraction of copper and the co-leaching behaviour of other metals from waste printed circuit boards using alkaline glycine solutions

Huan Li, Elsayed Oraby, Jacques Eksteen

Waste printed circuit boards (WPCBs) are a complicated and valuable fraction of electric and electronic waste. The recycling of them is critical to av

2025enPDF

Recovery of valuable metals from mining and mineral processing waste

Roger Rumbu

2025enPDF

New hybrid electrolyte for high performance Li-ion batteries

TohoKu University

This article reports the development of a hybrid polymeric solid electrolyte designed to enhance the safety and performance of lithium-ion batteries (

2022enPDF

A solid battery electrolyte with high performance

PNAS Nexus

This article reports the design and characterization of a high-performance, truly solid polymer electrolyte for lithium-based batteries, addressing lo

2023enPDF