PDF

Using Linear Programming to Minimize Fre

Suliman Emdini Gliwan, Kevin Crowe

2026engold ore processinglinear programmingwater allocation model

Abstract

Language:

Gold mines deliver gold ore and waste rock to processing facilities, after which the ore is separated from the rock through an 11-stage process. The stages of ore processing require large quantities of fresh-water which are drawn from nearby lakes or rivers. Given the greater importance placed on environmental sustainability, gold producers have become increasingly interested in reducing the amount of freshwater required to process their ore. One strategy by which this can be achieved is by replacing fresh-water with recycled water, wherever feasible, within the 11 stages of processing. The objective of this research is to develop and apply an optimization model by which the gold processing industry can reduce its use of fresh-water by identifying, within the processing stages, where, and up to how much recycled water can replace fresh-water. To achieve this objective, a linear programming model of this optimal water allocation problem was developed to minimize the use of fresh-water in ore processing, subject to maintaining the feasibility of the processing stages by satisfying constraints on pollutant concentrations. The model was applied to a gold processing facility owned by Goldcorp Ltd. in Red Lake, Ontario, Canada. The results show that the optimal solution generated by the model required 51 metric tonnes/hr of fresh-water versus the current use of 68.6 metric tonnes/hr – a reduction in freshwater use of 25.7%. This research is innovative insofar as an optimization model aimed at minimizing fresh-water usage has not been applied to the gold processing problem by prior researchers.

Download

Cite This Work

@article{c836103d-0908-48bb-aaef-85d1e0000943,
  title={Using Linear Programming to Minimize Fre},
  author={Suliman Emdini Gliwan and Kevin Crowe},
  year={2026},
  language={en}
}
TY  - JOUR
TI  - Using Linear Programming to Minimize Fre
AU  - Suliman Emdini Gliwan
AU  - Kevin Crowe
PY  - 2026
LA  - en
ER  -

Similar Items

Metal Casting Processes

Unknown, Unknown

This chapter discusses metal casting processes, highlighting the diversity and common characteristics among them. The objective is to elucidate the fu

2023enPDF

The Nature of Solid Iron and Its Grain Structure

Unknown, Unknown

This study focuses on the fundamental characteristics of solid iron, which is predominantly composed of iron atoms and provides a basis for understand

2023enPDF

842063941 SX configuration

2026enPDF

758686865 Procedes metallurgique speciaux

Ir. Méshac KIME ILUNGA

Ce document traite des procédés métallurgiques spéciaux, en mettant particulièrement l'accent sur l'extraction liquide-liquide, un processus mis au po

2026enPDF

729490895 TFC Jordi kayombo

Copper solvent extraction units at large hydrometallurgical plants face constraints in metal recovery, phase disengagement, and reagent consumption, d

2026enPDF

790734466 METALLURGIE EXTRACTIVE DU CUIVRE hydrome tallurgie

Non spécifié

L'hydrométallurgie du cuivre, principalement axée sur les minerais oxydés facilement solubles, s'applique également aux minerais sulfurés ou mixtes ap

2026enPDF