PDF

eversvd,+9 (7)

Hrvoje Antićević, Anita Bukovac

2026entunnel engineeringgeotechnical investigationkarst cavesrock massexcavationrehabilitationspeleologygeotechnicstunnel

Abstract

Language:

The construction of the 'Počitelj' tunnel, part of a highway project, faced challenges due to unforeseen speleological objects that emerged during excavation in weathered carbonate rocks. This study aims to address the issues related to the appearance of these speleological phenomena, which complicate construction processes and incur additional costs. A combined approach involving extensive investigative works was utilized to improve the accuracy of geological profiles prior to tunneling. Despite pre-excavation efforts, the unpredictability of speleological object occurrences necessitates a robust rehabilitation methodology upon their detection. The research involves collaboration among experts in multiple disciplines, including speleology, geology, geodesy, geotechnics, mining, and construction to devise effective solutions. Results indicate that the defined framework for professional collaboration and a structured rehabilitation process is crucial in managing the complexities introduced by unexpected speleological findings during tunnel construction. By establishing clear objectives and professional bases for intervention, this approach aims to mitigate delays and provide a coherent methodology for addressing such challenges in geotechnical design projects.

Download

Cite This Work

@article{d2b1eb41-897e-4606-aa51-7be84b462ca3,
  title={eversvd,+9 (7)},
  author={Hrvoje Antićević and Anita Bukovac},
  year={2026},
  language={en}
}
TY  - JOUR
TI  - eversvd,+9 (7)
AU  - Hrvoje Antićević
AU  - Anita Bukovac
PY  - 2026
LA  - en
ER  -

Similar Items

Challenges and opportunities in the recovery of gold from electronic waste

Mudila Dhanunjaya Rao, Kamalesh K. Singh

Rapid global technological development has resulted in increased production of electronic waste, which presents both challenges and opportunities in r

2023enPDF

640069

Roger Rumbu

2025enPPTX

Optimization of Integrated Steel Plant R

This paper addresses the challenge of assessing the feasibility of wind power plant projects at sites with insufficient or no local historic wind data

2025enPDF

Design for Recovery of Precious and Base

2026enPDF

Electrochemical techniques for a cleaner

Important advances in electrochemical engineering technology over the last three decades have fostered the development of a lternative methods to alle

2026enPDF

Environmental and Human Health Risks Ass

2026enPDF