PDF

Process Design for Direct Production of Battery Grade Nickel Sulfate

Päivi Kinnunen, Teppo Riihimäki

2024ennickel sulfateprocess designsustainabilitybatterieshydrometallurgy

Abstract

Language:

The clean energy transition has increased the global demand of nickel sulfate used in Li-ion batteries. A short-term solution is to refine the nickel sulfate product from nickel intermediates. In the long term, new direct nickel sulfate production technologies are needed. This research focused on the modeling-based concept development of a novel direct hydrometallurgical nickel sulfate process consisting of chemical leaching, impurity removal by precipitation, solvent extraction, and crystallization as an alternative to the conventional nickel sulfate production route via a nickel matte intermediate. The conventional process route with the studied nickel concentrate had lower chemical consumption and waste production compared to direct hydrometallurgical process where approximately 60% of iron was leached consuming oxygen, and the following iron precipitation step consuming calcium carbonate resulted in a high amount of iron precipitate together with gypsum. However, hydrometallurgical alternatives are often suitable for lower ore grades or volumes and can recover copper as by-product metal. The biggest impacts on carbon footprint from chemical consumption in the direct hydrometallurgical process were generated in iron precipitation and oxygen use in leaching. With the studied nickel concentrate, pyrrhotite played a key role in both oxygen use and iron precipitation. In the leaching step, 68% of total oxygen consumption was related to pyrrhotite leaching, while in iron removal 73% of total iron originated from pyrrhotite. Thus, especially pyrrhotite removal prior to leaching needs to be developed to reduce the carbon dioxide footprint, when the pyrrhotite content in the material is high.

Download

Cite This Work

@article{d5ccabfd-99a6-4fe9-8d27-aec7d2aaec62,
  title={Process Design for Direct Production of Battery Grade Nickel Sulfate},
  author={Päivi Kinnunen and Teppo Riihimäki},
  year={2024},
  language={en}
}
TY  - JOUR
TI  - Process Design for Direct Production of Battery Grade Nickel Sulfate
AU  - Päivi Kinnunen
AU  - Teppo Riihimäki
PY  - 2024
LA  - en
ER  -

Similar Items

842063941 SX configuration

2026enPDF

729490895 TFC Jordi kayombo

Copper solvent extraction units at large hydrometallurgical plants face constraints in metal recovery, phase disengagement, and reagent consumption, d

2026enPDF

653682511 Cours 10 pyrometallurgie

2026enPDF

10.1080 08827509208952675.pdf HABASHI, FATHI ( WeLib.org )

FATHI HABASHI

In the past few years, extractive metallurgy has been advancing gradually, despite the absence of remarkable new ideas. This paper aims to summarize t

2026enPDF

Extractive Metallurgy of Copper, Fifth Edition Mark E. Schlesinger, Matthew J. King, Kathryn C. Sole, ( WeLib.org )

Mark E. Schlesinger, Matthew J. King

This book presents a comprehensive overview of the principles and practices of copper extraction metallurgy. The objective is to provide both a theore

2026enPDF

Extractive Metallurgy 3 Processing Operations and Routes Alain Vignes ( WeLib.org )

Alain Vignes

This book provides a comprehensive overview of the various processing operations and routes in extractive metallurgy. The objective is to present a de

2026enPDF