PDF

247 262 WG47 du Toit

2026engold miningtailingspaste fillslurry preparationunderground miningWest Africapaste backfillplant design

Abstract

No abstract available for this document.

Download

Cite This Work

@article{dec307c4-72f7-407c-b5dd-151b22a058e2,
  title={247 262 WG47 du Toit},
  author={Unknown},
  year={2026},
  language={en}
}
TY  - JOUR
TI  - 247 262 WG47 du Toit
AU  - Unknown
PY  - 2026
LA  - en
ER  -

Similar Items

Feasibility Study Plant Design

A. Ryan, E. Johanson

The design of process plants for feasibility studies must address several key objectives, including feasibility and constructibility, while focusing o

2005enPDF

Metallurgical Plant Design and Operating Strategies

P Card, J Canterford

This document presents a collection of papers from the METPLANT 2011 conference focusing on metallurgical plant design and operating strategies. The o

2011enPDF

Metallurgical Plant Design and Operating Strategies

The Australasian Institute of Mining and Metallurgy

This conference, held in Perth, Western Australia, focuses on the latest advancements in metallurgical processing plant design and operational strateg

2006enPDF

Recovery of valuable metals from mining and mineral processing waste

Roger Rumbu

2025enPDF

Optimization of Integrated Steel Plant R

This paper addresses the challenge of assessing the feasibility of wind power plant projects at sites with insufficient or no local historic wind data

2025enPDF

Design for Recovery of Precious and Base

2026enPDF