PDF

Preparation of the First Shipments of Transuranic Waste by the Los Alamos National Laboratory: A Rest Stop on the Road to the WIPP

Wander, S.G., Triay, I.R.

1999entransuranicwasteshippingcertificationenvironment

Abstract

Language:

The Los Alamos National Laboratory (LANL) achieved a national milestone on the road to shipping transuranic (TRU) waste to the Waste Isolation Pilot Plant (WIPP) when it received certification authority on September 12, 1997. This paper describes the characterization of a non-mixed TRU waste stream, identified as waste stream TA-55-43 Lot No. 01, and the methods employed to ensure it does not contain hazardous waste regulated by the Resource Conservation Recovery Act (RCRA) or the New Mexico Hazardous Waste Act (HWA). The non-mixed determination is based on the acceptable knowledge (AK) characterization process, which assesses that the waste does not exhibit any RCRA characteristics nor meet any RCRA listing descriptions. The certification process includes assembling an AK Summary Report, conducting headspace gas analysis, and performing real-time radiography (RTR) examination of the waste. LANL has successfully certified the TRU waste from this stream and is poised to certify additional quantities from other non-mixed TRU waste streams. This process highlights the necessary steps to prepare waste for shipment to the WIPP effectively.

Download

Cite This Work

@article{e17d6a25-799e-4055-af5b-476457adad2c,
  title={Preparation of the First Shipments of Transuranic Waste by the Los Alamos National Laboratory: A Rest Stop on the Road to the WIPP},
  author={Wander and S.G. and Triay and I.R.},
  year={1999},
  language={en}
}
TY  - JOUR
TI  - Preparation of the First Shipments of Transuranic Waste by the Los Alamos National Laboratory: A Rest Stop on the Road to the WIPP
AU  - Wander
AU  - S.G.
AU  - Triay
AU  - I.R.
PY  - 1999
LA  - en
ER  -

Similar Items

Chapter 20 Electronic Waste

Jirang Cui, Hans Jørgen Roven

Rapid growth in electronic equipment consumption has generated large quantities of electronic waste containing hazardous substances and high-value met

2026enPDF

E-WASTE IN TRANSITION FROM POLLUTION TO RESOURCE

Florin-Constantin Mihai

E-waste in Transition: From Pollution to Resource examines the dual nature of waste electrical and electronic equipment as both a major pollution sour

2016enPDF

Metal Casting Processes

Unknown, Unknown

This chapter discusses metal casting processes, highlighting the diversity and common characteristics among them. The objective is to elucidate the fu

2023enPDF

Artificial intelligence-aided materials design: AI-algorithms and case studies on alloys and metallurgical processes

Rajesh Jha, Bimal Kumar Jha

This book describes the application of artificial intelligence (AI) and machine learning (ML) concepts to develop predictive models that can be used t

2022enPDF

Metallurgical Plant Design and Operating Strategies

The Australasian Institute of Mining and Metallurgy

This conference, held in Perth, Western Australia, focuses on the latest advancements in metallurgical processing plant design and operational strateg

2006enPDF

Metallurgical Plant Design and Operating Strategies

David Pollard, Geoff Dunlop

The MetPlant 2008 conference focused on advancements in metallurgical processing of ores, emphasizing plant design, operation strategies, and innovati

2008enPDF