PDF

A precipitation method for arsenite ion

Takeshi ITAKURA, Ryo SASAI

2026enarsenic removalwastewaterhydrothermal treatmentmineralizationprecipitationcalcium compounds

Abstract

Language:

There is no effective method to recover arsenic dissolved in aqueous media in spite of its high toxicity. The cause for this problem resides in the difficulty to form precipitates with low solubility in water under normal pressure and temperature conditions. We developed a new technology to recover arsenite ion (AsIII) as arsenate apatite (Ca5(AsO4)3(OH)) from its aqueous solution by a hydrothermal mineralization treatment. A wide range of initial concentration of arsenite ion (1–2000 mg L–1) was found to reduce to 0.04–0.06 mg L–1 after the treatment. The precipitate is natural minerals, Johnbaumite, which is easily reused as a raw material for the production of industrial–grade arsenic compounds.

Download

Cite This Work

@article{fd656c4f-275e-4860-b2e7-b1b1a770653b,
  title={A precipitation method for arsenite ion},
  author={Takeshi ITAKURA and Ryo SASAI},
  year={2026},
  language={en}
}
TY  - JOUR
TI  - A precipitation method for arsenite ion
AU  - Takeshi ITAKURA
AU  - Ryo SASAI
PY  - 2026
LA  - en
ER  -

Similar Items

Electrochemical techniques for a cleaner

Important advances in electrochemical engineering technology over the last three decades have fostered the development of a lternative methods to alle

2026enPDF

Metal Casting Processes

Unknown, Unknown

This chapter discusses metal casting processes, highlighting the diversity and common characteristics among them. The objective is to elucidate the fu

2023enPDF

The Nature of Solid Iron and Its Grain Structure

Unknown, Unknown

This study focuses on the fundamental characteristics of solid iron, which is predominantly composed of iron atoms and provides a basis for understand

2023enPDF

842063941 SX configuration

2026enPDF

758686865 Procedes metallurgique speciaux

Ir. Méshac KIME ILUNGA

Ce document traite des procédés métallurgiques spéciaux, en mettant particulièrement l'accent sur l'extraction liquide-liquide, un processus mis au po

2026enPDF

729490895 TFC Jordi kayombo

Copper solvent extraction units at large hydrometallurgical plants face constraints in metal recovery, phase disengagement, and reagent consumption, d

2026enPDF